Wednesday, August 4, 2010

East Side Curb Installation

Due to the rain yesterday, the curb installation on the east side was pushed back a day. It was originally scheduled for today, but now it will be poured tomorrow (if the rain cooperates with us!). The schedule then will be to pour the driveways on Monday. With the 72-hour cure period needed for concrete, the driveways should be reopened Thursday afternoon, all weather dependent of course.

No comments:

Post a Comment